4.2 KiB
okf_version
| okf_version |
|---|
| 0.1 |
Files
-
Commitments - Active work tasks, follow-ups, approvals, and scheduled items extracted from sources (web-search, git-repo, literature flywheel-sync, etc.). Personal errands live in /personal-logistics.md instead.
-
2026-07-16 工具链打通战报 - After-action report on Robin's 2026-07-16 end-to-end toolchain integration: OpenWiki + Gitea + NocoDB + RAGFlow + Wiki.js + MiniMax code all wired together and working in production. Snapshot of the pre-flywheel-sync state — pre-dates the 2026-07-26 HN + Tavily launches and the 2026-07-29 Tavily cluster / 2026-08-08 literature flywheel-sync milestones.
-
Open Questions - Active, Answered, and Stale unresolved questions about Robin's memory, recurring routines, people, projects, and wiki quality. Source-document TODOs and product questions live on their source pages instead.
-
Personal Logistics - Personal errands, appointments, pickups, travel, household/life-admin deadlines, and other non-work logistics. Work commitments live in /commitments.md.
-
Robin's Local Knowledge Base - OpenWiki entrypoint and orientation — Robin's personal knowledge base with 5 synthesis themes (organoid equipment, bioprinting, AI agents, local LLM, personal research), navigation map, current connector status, and backlog. The 2026-09-25T18:17Z git-repo-1 fetch is the forty-first pull since 2026-08-07 and observed vault HEAD unchanged at
09bec367for the 14th consecutive fetch (0 new vault commits since the 2026-09-11 Tomas 2026 HGSC + Vijakumaran 2026 brain-organoid ALI oxygen engineering commits). Wiki HEAD bumped17e9fafc→f9bb2e5evia 2 automated wiki commits (069eef3daily update +f9bb2e5sources-sync, the forty-second consecutive sources-sync). 11-dirty-file baseline (down from 12-dirty). 1 MOC working-tree modification persisting uncommitted for 12 calendar days. Carry-forward bump 43/38/38/31 → 44/39/39/32-day. The 2026-09-25T18:00Z hackernews-1 fetch (45th pull) surfaced49841563Dutch government builds alternative for Microsoft based on NixOS 842 pts + 493 cmts as the highest-engagement item of the 2026-09-25 pull + the named-stack-adjacent independent-substrate cross-walk candidate to theagent-memory-architecturerow +49836374Opus 5.5 is good at explainer videos 372 pts + 202 cmts as the 8th adjacent-not-promoted cross-walk candidate to the closed-weight-M3-comparison-anchor cluster +49845977U.S. appeals court upholds designation of Anthropic as supply chain risk 196 pts + 256 cmts as the 9th adjacent-not-promoted closed-weight-M3 cluster entry candidate + 23rd adjacent-not-promoted AI-vendor-business-stack cluster entry candidate +49844348Scientists revive activity in frozen mouse brains for the first time 1 pt as a brain-research adjacency cross-walk to theclass-organoid-3d-bioprintingrow's neuroscience-in-vitro application domain (NOT a true biological-organoid match; 1-pt engagement below the 100-pt refresh bar). No cluster promotion this pull. The 2026-09-25T18:14Z web-search-1 attempt was the forty-third consecutive skip (TAVILY_API_KEY empty + runtime registry still reports the connector as disabled) — no Tavily request issued, no new vendor-news data for CelVivo / 3Brain / Cellink / organoid workflows; the Tavily-anchored commitment items and theme rows stay anchored on the 2026-08-03 baseline + post-2026-08-03 evidence from other sources. -
OpenWiki 现状 + 操作手册 (2026-07-27) - Activation status + operations manual for Robin's local OpenWiki knowledge base as of 2026-07-27. Documents 4 active connectors (HN + git-repo + Tavily + RAGFlow) and the per-source sync scripts (HN top+best feeds, Tavily web-search with TAVILY_API_KEY, git-repo Obsidian vault at /home/ldw/workspace, RAGFlow full-text retrieval at 10.10.10.254:9980). Captures the on-disk Gitea commit + push pattern.
-
Themes - Recurring topics, signals, and trends observed across Robin's sources. Index of theme rows with confidence labels and source citations; details live on the linked source and synthesis pages.