chore: daily update 2026-08-01
This commit is contained in:
@@ -53,6 +53,13 @@ Concrete work tasks, follow-ups, approvals, and scheduled items extracted from G
|
||||
- Status: open
|
||||
- Notes: Watchlist lead, not a confirmed launch or customer win. Verify that the posts come from CelVivo or an authorized distributor, whether `ClinoStar 2` is current official product naming, and whether the NexUs Locus live demo produced reusable data or contacts. The result set does not support Tavily's “installed base” language; one malformed duplicate URL was discarded.
|
||||
|
||||
### itx-24h-host-build-2026-q3: finish assembly + Ubuntu + Hermes install on Robin's 24h host (paused since hardware is 10/11 arrived)
|
||||
- Owner: me
|
||||
- Source: git-repo — `03-Resources/ITX-24h-Host/ITX_24h_Host_v18_Config_2026-07-31.md` (Obsidian vault, untracked as of fetch 2026-07-31T18:08:12Z)
|
||||
- Due: unscheduled (waiting for the last #8 / #9 cable parts on hand; once on hand, finish the assembly + software stack)
|
||||
- Status: open
|
||||
- Notes: Personal-infra work item (workflow-tooling priority LOW), not vendor-anchored — logged here because it is source-anchored to Robin's actual vault work per the brief's commitments.md rule ("only real Robin commitments"). Plan: mATX + i5-12400 + DDR4-2666 32G + 板载 Realtek 1Gb + Intel PRO/1000 GT (¥2,985.82, 10/11 parts on hand). Two 网卡 VLAN: 192.168.31.100 → 主力机 Win 11 SSH, 10.10.10.254 → 主力 NAS RAGFlow. Post-assembly steps: Ubuntu Server 22.04 LTS install, partition `/` (GM7 512G) + `/data` (mSATA 512G), Docker, dual-NIC 静态 IP, 主力机 SSH key 免密, NAS RAGFlow API 接入, 安装 Hermes Agent, 24h 跑功耗 soak test. The host has no vendor-product overlap; not promoted to `/themes.md` row because that index is reserved for recurring workflow signals.
|
||||
|
||||
<!--
|
||||
Structure for new entries:
|
||||
|
||||
|
||||
Reference in New Issue
Block a user